Product Details:
|
Customized: | Customized | Machine Name: | Women Pantyliner Machine Direction Panty Shield Machine |
---|---|---|---|
Model: | ZLPL-I/II/III | Packing Details: | Plywood Pallets Wrapped By PE Film |
Machine Color: | To Be Appointed By The Buyer | Efficiency: | ≥85% |
High Light: | Women Panty Liner Machine,ultra thin Panty Shield Machine,Panty Liner Machine 1500pcs min |
Women Pantyliner Machine Direction Panty Shield Machine
APPLICATION FOR MACHINE DIRECTION PANTYLINER MACHINE:
Disposable Machine direction Panty liner (Panty Shield) product can be produced by the machine. The product adopts pulp core or airlaid ultra-thin core structure. Suitable for daily use by female.
MAIN PERFORMANCES AND CHARACTERISTICS:
Design speed: | 600 ~ 1500pcs/min |
Production speed: | 500 ~ 1200 pcs /min |
Product size: |
140mm~190mm (Products can be customized according to requirements) |
Efficiency: | ≥85% |
Waste rate: | ≤3% |
Power: | 380V, 50Hz, 3 Phases |
Overall dimensions (working area): L * W * H: | around 19m*7m * 2m |
*For reference only, the final technical parameters depend on the final confirmed machine configuration.
MACHINE CONFIGURATIONS
The product direction is consistent with the conveying direction of the machine. The product adopts pulp core or airlaid ultra-thin core structure.
Disposable Machine direction Panty liner (Panty Shield) machine is made up of follows systems,
During operation, Man-machine dialogue realized by PLC and man-machine interface. The touch screen can be a timely operation, display and check or modify the point of failure data. To manual or auto control the spray glue, change material, cutter roller, unwinding, reject, material broken detection, material loss detection, counting.
OUR SERVICE:
Pre-Sales Service
* Inquiry and consulting support
* Product technical support
* Workshop layout technical support
* View our factory
After-Sales Service
* Training how to use and maintain the machine: During the machine test at the Seller’s plant, the
Buyer can send 2 staffs for a free training period of 7 days. Food, accommodation and the round trip air tickets will be at the Buyer’s account.
* Provide machine failure solutions
* Spare parts provide(Charge according to different spare parts cost)
Contact Person: Shirley
Tel: +8613958036376